Skip to content

Saudi National Highway Lighting Renewal: Thousands of BCT-OLF-140W Solar Street Lights Illuminate Desert Arteries

——Blue Carbon All-in-One Solution Reshapes Green Infrastructure Benchmark in the Middle East

Project Background: Lighting Challenges in Desert Highways

Spanning vast deserts, Saudi national highways face perennial extreme environmental challenges:

  • Extreme Heat: Surface temperatures exceed 50°C, accelerating circuit aging;
  • Grid Coverage Difficulties: Prohibitive power supply costs in remote sections, challenging cable installation;
  • Sandstorm Threats: Frequent failures due to inadequate equipment sealing, reducing maintenance efficiency.
    Traditional high-pressure sodium lamps consumed millions of kWh annually, with maintenance teams overwhelmed by line faults.

Solution: BCT-OLF-140W All-in-One Solar Street Light

“Zero Cables, Zero Electricity Bills, Zero Blackouts” – Eternal Light in the Desert
Large-scale deployment of thousands of BCT-OLF-140W units achieves full highway lighting upgrade:

BreakthroughTraditional Pain PointsBlue Carbon Advantage
Energy SystemGrid-dependent, high costs140W Mono Panel + 250Ah LiFePO4 Battery
Extreme EnvironmentOverheating, sand erosion-40°C~70°C operating range, IP65+IK08
Installation & MaintenanceComplex cabling, time-consuming repairsIntegrated modular design, rapid installation
Lighting PerformanceSevere attenuation, uneven coverage12,000lm batwing beam, 150° wide-angle coverage

Project Results: Data-Driven Transformation

Safety Enhancement
▶ Uniform 150° batwing beam eliminates dark zones;
▶ 6500K high-penetration cold white light improves visibility in sandstorms, reducing accidents by >30%.

Cost & Energy Savings
▶ Annual grid electricity reduction: Over a million kilowatt-hours;
▶ O&M costs reduced by 70%, eliminating cable replacement and electricity bills.

Reliability & Durability
▶ IP65 dust/waterproof + IK08 impact resistance withstands sandstorms and heat;
▶ Smart dimming ensures 6+ nights illumination during rainy seasons.

Project Significance: Green Infrastructure Paradigm

✅ Zero Civil Works: No trenching or cabling, preserving desert ecology;
✅ Rapid Deployment: 60% shorter construction period;

Blue Carbon Technology Declaration

With 100,000-hour lifespan imported LED chips,
Military-grade aluminum alloy heat dissipation resisting desert scorch,
We ensure every beam of light withstands Earth’s most severe tests.

Blue Carbon, lighting up the way home.

Send your inquiry